Empowering the Future of Wind Energy

The very first Maxcap 141 was installed by the Maxcap team by the end of 2023 and commissioned by March 2024. This represents a major milestone in the design and development of this turbine. Since 2021, Windwise has been conducting project development for the turbine and the wind measurement mast installed to support the measurement campaign. The turbine is currently operating with excellent performance in terms of availability and power curve.
Scroll to Top