maxcap - Tender
The maxcap project is funded by the state of North Rhine-Westphalia progres.nrw.
In the maxcap project, a base-load optimised wind turbine is being developed and designed for demand-responsive energy production.
The purpose of the project is, in addition to the further development of existing technologies for the drive train, to develop and design an overall system of a wind turbine generator for previously uneconomic locations (low wind locations) onshore. Additionally,we reduce the volatility of the feed-in (better base-load capability) and maximise the capacity factor.
There are currently no tenders for the maxcap project.
WINDWISE GMBH
Augustastraße 47/49a
48153 Münster
E-mail: info@windwise.eu
Phone: +49.251.590 667 0
EVERYTHING AT A GLANCE