maxcap_Logo_turbine_RGB

maxcap - Tender

The maxcap project is funded by the state of North Rhine-Westphalia progres.nrw.

In the maxcap project, a base-load optimised wind turbine is being developed and designed for demand-responsive energy production.

The purpose of the project is, in addition to the further development of existing technologies for the drive train, to develop and design an overall system of a wind turbine generator for previously uneconomic locations (low wind locations) onshore. Additionally,we reduce the volatility of the feed-in (better base-load capability) and maximise the capacity factor.

There are currently no tenders for the maxcap project.

WINDWISE GMBH

Augustastraße 47/49a

48153 Münster

E-mail: info@windwise.eu

Phone: +49.251.590 667 0

FOLLOW US ON